project cost
美
英 
- 網(wǎng)絡(luò)工程造價;項目成本;工程項目費用
例句
Earned value is an effective method for project cost and progress integration, but it does not take account of quality factors.
掙值法是一種有效的項目成本和進度集成方法,卻未考慮質(zhì)量因素。
Compact, easy to move, easy to install and can reduce the project cost, without the construction of pumping stations.
結(jié)構(gòu)緊湊,移動方便,安裝簡單,可減少工程造價,無需建造泵房。
First, the cost of modern management theory and practical experience applied to cost management, improving project cost management level.
將現(xiàn)代成本管理理論和經(jīng)驗運用于企業(yè)成本管理實際,提高施工項目成本管理層次。
This paper describes how the decision-making stage, the design phase of the project cost control within the approved limits.
本文主要介紹如何從決策階段、設(shè)計階段把工程造價控制在批準的限額之內(nèi)。
Be on guard risk of project cost audit is the foundation that does work of audit of good project cost, its sense is quite great.
防范工程造價審計風險是做好工程造價審計工作的基礎(chǔ),其意義相當重大。
The project cost is the construction of a project put into operation by the expenditure of the sum of the cost.
工程造價是指一個建設(shè)項目建成投產(chǎn)所支出的各項費用的總和。
The fourth part of the design of the project cost of college education cost accounting and accounting subjects.
第四部分設(shè)計高校教育成本核算成本項目和會計科目。
Therefore, the influenced exerted by risks on cost management must be taken into account during the project cost management, i. e.
因此在工程項目造價管理中必須考慮風險對造價的影響,即對工程造價進行風險管理。
The team of project cost management was set up to bring the project cost into the "static control and dynamic management" system.
成立了工程造價管理課題小組,對工程造價實行“靜態(tài)控制,動態(tài)管理”;
Warm mix asphalt also has reduced the project cost, with the advantages of extending the service life of asphalt pavement.
溫拌瀝青混合料還具有降低工程成本,延長瀝青路面使用壽命的優(yōu)勢。
Because of this reform, the formation mechanism of project cost has been a fundamental change.
由于這一革新,工程造價形成機制發(fā)生了根本轉(zhuǎn)變。
Project showed that a large number of domestic and international engineering design phase of the project cost impact of up to 35% to 75%.
國內(nèi)外大量工程實例表明工程設(shè)計階段對工程造價的影響可達到35%~75%。
Project cost and schedule cannot be finalized without completing risk management.
沒有完成風險管理,項目成本和進度就不能最后達成。
It proves that construction schedule, quality and safety goals can be reached with DOKA formwork system, and project cost can be reduced.
實踐證明,DOKA大模板系統(tǒng)可保證施工進度、質(zhì)量、安全,并可節(jié)約成本。
Indeed, the hidden cost for the total project cost of 7 to 10% should be reasonable.
據(jù)業(yè)內(nèi)人士介紹,隱蔽工程報價占到總報價的7%至10%應(yīng)該是合理的。
If the basic construction cost is controlled very good, the goal of the total project cost will be achieved.
只要控制好最小施工單元的成本,項目總成本的目標就可以實現(xiàn)。
Therefore, the implementation phase of construction projects on the dynamic management of project cost is a very important issue.
因此,在建設(shè)項目實施階段對工程造價的動態(tài)管理研究是一個十分重要的課題。
The application of the Earned Value Method in project cost control management make cost can be evaluated.
利用項目掙得值法進行項目費用的控制,保證項目的費用在預(yù)算之內(nèi)。
Fifth, the construction project cost management provides the weight construction project management achievements the objective rod.
施工項目成本管理提供衡量施工項目管理績效的客觀標尺。
This paper studies the application of the thoughts of postponement into resources distribution for project cost optimization.
文中在成本優(yōu)化的目標下,研究如何利用延遲的思想來解決如何分配項目的資源。
The system is easily operation, a simpler process, lower the project cost and good applicable prospect.
該工藝系統(tǒng)簡單,運行可靠,投資少,有較好的應(yīng)用前景。
You can identify tasks or resources with budget risks and adjust the task or resource costs to bring the total project cost within budget.
可以確定具有預(yù)算風險的任務(wù)或資源,調(diào)整任務(wù)或資源成本以便將項目總成本控制在預(yù)算內(nèi)。
Accordingly, must press the objective law of goods economy, control project cost reasonably.
因此,必須按商品經(jīng)濟的客觀規(guī)律,合理地控制工程造價。
The solution was rolled out to all 37 financial institutions within Synovus at no additional project cost.
在沒有增加項目成本的情況下,解決方案在Synovus旗下所有37家金融機構(gòu)中得到了實施。
construction project; cost control; Pareto law of income distribution.
建設(shè)項目;費用控制;帕累托收入分配定律。
In short, the pre-construction project cost control for the entire project cost control has played a very important role.
總之,建設(shè)項目前期的造價制約對整個項目的造價制約有著非常重要的作用。
Finally, Palm Springs International Apartment in Beijing real estate construction project cost management real cases were analyzed.
最后通過對北京棕櫚泉國際公寓房地產(chǎn)建設(shè)項目成本管理實際案例進行了系統(tǒng)分析。
Every taches of the communications project cost management system have mutual contacts and interactions.
在通信工程成本管理系統(tǒng)中每一個環(huán)節(jié)都是相互聯(lián)系和相互作用的。
As commented by the Standish Group, requirements issues account for 41% of the reasons for project cost overruns and cancellations.
正如StandishGroup的意見一樣,需求問題通常要為項目的開銷超支或者項目的取消等負上41%的責任。
The standard of project cost management has turned into the main factor with company's survival and development.
工程項目成本管理水平的高低成為制約企業(yè)生存與發(fā)展的主要因素。
Initially, this paper analyse the lacks of the traditional communications project cost control methods.
論文首先研究了傳統(tǒng)的通信工程項目成本控制方法,分析了它們的不足。
In order to reasonably reflect the project cost, budget and project budget is usually fixed in engineering to build a way to separate them.
為了合理反映工程造價、預(yù)算定額和工程預(yù)算通常以工程構(gòu)筑方式進行分類。
Therefore, it is of great importance to guarantee and accelerate economic development to do the project cost control.
因此做好工程造價的控制工作,對保證和加速經(jīng)濟發(fā)展具有一定意義。
To develop the existing customer, introduction of new project, cost reduction program and product change.
對現(xiàn)有客戶進行開發(fā),介紹新的項目,降低成本及產(chǎn)品交換。
Reducing well spacing can economize project cost, but it will cause group pile effect and bring on the phenomenon of repelling hammering.
減小井距可節(jié)約工程費用,但會引起群樁效應(yīng)而導(dǎo)致拒錘現(xiàn)象發(fā)生。
The owner and the contractor agree to a project cost guaranteed by the contractor as maximum.
業(yè)主和承包商同意由承包商保證的一個工程成本值作為最大值。
Finally, compare the fourth concrete support of the Century Avenue and Lake Station from the duration and the project cost two aspects.
最后從工期以及工程造價兩方面對世紀大道和湖濱站第四道砼撐進行對比。
construction project; cost control; Longquan hotel construction project.
建設(shè)項目;造價管理;龍泉酒店建設(shè)項目。
Through the economic analysis of ameliorated saline soil, the paper appraises the influence of project cost.
通過改良鹽漬土經(jīng)濟分析,評價了其對工程造價的影響。
Experienced on Project Cost Estimation, Tender Package preparation and Design coordination.
在項目費用估算,標書準備和設(shè)計協(xié)調(diào)方面富有經(jīng)驗。